



The through plate girder bridge is based on the prototype that sported construction of a bridge deck supported between two plate girders. This type of construction gives it the easily identifiable 'U'-shape. The construction depth on this type of bridge was much less than on other bridges, providing a minimal change of height while clearing terrain. It was a common sight on railroads.
This new model comes in single and double track versions, as well as a single track add on kit. All are available in Code 83 or Code 100.
Features:
Reservations Due By: September 6, 2016
Expected Release: April 2017
JMP